How Does a Jack-Up Rig Move? Tow, Survey, Acceptance

How a jack-up rig moves: wet tow versus dry tow, marine warranty survey sign-off and the port work an agent must have ready before the rig arrives.

A jack-up rig moves by retracting its legs, floating on its hull and being towed to the next location, then jacking up again and passing inspection and acceptance before drilling starts. The move is a project in itself, and most of the port work happens before the tug line goes taut.

Offshore drilling contractors keep winning and extending work, so rigs keep moving between basins. According to Splash247 (November 2026), ADNOC Drilling won two Kuwait Oil Company jack-up contracts with a combined maximum value of KWD96.55m. Each award means a rig has to be mobilised, and every mobilisation creates a short, intense window for chandlers, bunker suppliers, agents and repair yards.

Wet tow or dry tow: what decides it?

A wet tow means the rig floats and is pulled by tugs; a dry tow means the rig is loaded onto a heavy-lift vessel and carried. Distance, weather window, leg length and insurance terms decide which is used.

  • Wet tow suits shorter moves within a basin, where the rig can be towed at its transit draught and the marine warranty surveyor accepts the route forecast.
  • Dry tow suits ocean crossings and avoids exposing the legs and hull to long ocean passages. It needs a heavy-lift vessel, a load-out plan and a stowage survey.

The tow condition is a design case, not an afterthought. A 2025 study in Applied Ocean Research modelled living quarters under harsh environmental conditions during wet towing, including green water pressure on the structure. A 2022 paper in Civil Engineering Journal notes that jack-up legs accumulate fatigue in three conditions (transit, preloading and operating) and that transit fatigue is often approximated rather than calculated in detail (Civil Engineering Journal). Towing hours are therefore engineering hours, and surveyors treat them that way.

What a marine warranty surveyor signs off

A marine warranty survey (an independent technical review required by the rig's insurers before a major marine operation) is the gate every move passes through. The surveyor reviews the tow plan, tug bollard pull, leg-locking arrangements, weather limits and the load-out or jack-up sequence.

Marine warranty surveying is mandatory insurable practice for offshore oil and gas operations, and its practitioners work along a defined flight path of inspections and approvals, as described in a 2021 paper in the Journal of Clinical Images and Medical Case Reports (JCMCR). For suppliers, the practical point is timing: the surveyor's approval date sets the arrival window, and the agent's port preparations must be complete before it.

Port preparations the agent must have ready

A rig arrival is not a normal port call. The agent coordinates berth or anchorage, tugs, pilots, customs and immigration for a unit that may have 80 to 120 people on board.

  1. Pre-arrival notices and port formalities. File the rig's particulars, ownership and insurance with the port authority and customs, and confirm the berth or lay-by anchorage.
  2. POB transfers. POB (persons on board, the crew and specialist personnel counted for safety and immigration) must be declared, and crew changes arranged with immigration before arrival.
  3. Waste reception. Rig waste, slops and sewage need a licensed reception facility booked in advance; the requirements mirror those for ships under MARPOL waste reception rules for chandlers and agents.
  4. Provisions, fresh water and bunkers. Chandlers and bunker suppliers need the final POB and the rig's own storage limits before quoting.
  5. Repair and inspection scope. Any leg, jacking system or hull work is usually scheduled around the surveyor's acceptance, not before it.

Timing is unforgiving. Offshore Energy reported in November 2026 that Chevron extended ADES' 2007-built jack-up in Angola until February 2028 (Offshore Energy), and in the same month that Velesto's 2010-built rig won new work with Petronas off Malaysia (Offshore Energy). Each of those awards is a mobilisation, and each mobilisation is a supplier opportunity that closes once the rig sails.

Acceptance on location

Acceptance happens offshore, after the rig has jacked up, preloaded and been surveyed at the new location. Preloading is the stage where the rig loads its legs to test seabed strength before drilling; the 2022 Civil Engineering Journal paper treats it as one of the three design conditions (Civil Engineering Journal).

The risk is real. Offshore Energy reported in October 2026 that 110 people were rescued and five remained missing after a punch-through incident on a Borr Drilling jack-up off Gabon (Offshore Energy). Punch-through is the sudden leg penetration into the seabed that can destabilise a rig during preloading. Suppliers who understand the sequence know that the highest-value window is before the tow, not after acceptance.

Where the supplier work sits in the sequence

Most supplier revenue is booked in the weeks before the tow, when the rig is still at the old location or in a yard. The sequence below shows where each service lands.

  • Before tow: provisions, fresh water, bunkers, waste reception, crew change support, last-minute repairs.
  • During tow: tug support, escort and stand-by arrangements, weather routing.
  • On arrival: POB transfers, immigration, waste reception again, any repair scope deferred from the survey.

New offshore infrastructure keeps adding to this pipeline. MarineLink reported in October 2026 that Mammoet, the Port of Argentia and Argentia Capital signed an MOU to advance a floating dry dock and marine repair facility in Newfoundland and Labrador (MarineLink), a project that would sit directly in the path of rig and offshore vessel mobilisations.

How VesselReach helps

Rig mobilisations are visible before they happen, if you watch the right ports. VesselReach turns vessel movements into conversations with the people who buy.

  • Vessel intelligence: see vessels near your target ports and scheduled arrivals, which means you can approach the rig's managers before the tow begins.
  • Decision-maker discovery: find operations, procurement and marine superintendents by role, which means your quote reaches the person who approves it.
  • Multichannel outreach: staged email, WhatsApp and phone contact, which means follow-ups happen without manual chasing.

Book a VesselReach demo to see how it works on your ports.

Key facts

  • According to Splash247 (November 2026), ADNOC Drilling won two Kuwait Oil Company jack-up contracts with a combined maximum value of KWD96.55m. Splash247
  • Offshore Energy reported in October 2026 that 110 people were rescued and five remained missing after a punch-through incident on a Borr Drilling jack-up off Gabon. Offshore Energy
  • Offshore Energy reported in November 2026 that Chevron extended ADES' 2007-built jack-up in Angola until February 2028. Offshore Energy
  • A 2022 paper in Civil Engineering Journal notes that jack-up legs accumulate fatigue in three conditions (transit, preloading and operating) and that transit fatigue is often approximated rather than calculated in detail. Civil Engineering Journal (Salehan Institute of Higher Education)
  • MarineLink reported in October 2026 that Mammoet, the Port of Argentia and Argentia Capital signed an MOU to advance a floating dry dock and marine repair facility in Newfoundland and Labrador. MarineLink

Frequently asked questions

How does a jack-up rig move from one location to another?

The rig retracts its legs, floats on its hull and is towed by tugs (wet tow), or is loaded onto a heavy-lift vessel (dry tow). On arrival it jacks up, preloads and is accepted before drilling starts. Source: Civil Engineering Journal (Salehan Institute of Higher Education)

What does a marine warranty surveyor check before a rig tow?

The surveyor reviews the tow plan, tug capacity, leg-locking, weather limits and load-out or jack-up sequence. Marine warranty surveying is mandatory insurable practice for offshore oil and gas operations, so approval gates the move. Source: Journal of Clinical Images and Medical Case Reports

What should a port agent prepare for a jack-up rig arrival?

Pre-arrival notices, berth or anchorage, tugs and pilots, customs and immigration for the POB, waste reception, provisions, fresh water and bunkers, plus any repair scope deferred until after surveyor acceptance.

Why is transit fatigue a concern during a rig tow?

A 2022 study in Civil Engineering Journal notes that jack-up legs accumulate fatigue in transit, preloading and operating conditions, and that transit fatigue is often approximated rather than calculated in detail. Source: Civil Engineering Journal (Salehan Institute of Higher Education)

How can maritime suppliers find rig mobilisation work before the tow?

Track rig contract awards and vessel movements at your target ports, then contact the rig's managers early. VesselReach shows scheduled arrivals and identifies decision-makers by role, so outreach starts before the rig sails.

Sources

  1. Nonlinear analysis and weight optimization of living quarters for offshore jack-up rigs: A sustainable engineering approach, Applied Ocean Research (Elsevier BV), 14 March 2025
  2. Estimation of Overall Fatigue Life of Jack-up Leg Structure, Civil Engineering Journal (Salehan Institute of Higher Education), 1 March 2022
  3. A look into “Outlining the challenges of Covid-19 health crises in Africa’s maritime industry: The case of maritime operations in marine warranty surveying practice”: Discussing ‘three pillar challeng, Journal of Clinical Images and Medical Case Reports, 26 November 2021
  4. ADNOC Drilling chosen for $315m Kuwait offshore rig deals, Splash247, 9 November 2026
  5. Chevron keeps ADES’ 2007-built jack-up rig busy in Angolan waters for another year, Offshore Energy, 3 November 2026
  6. Rig incident: 110 rescued, 5 still missing after Borr Drilling’s jack-up sinks off Gabon coast, Offshore Energy, 25 October 2026
  7. Mammoet, Port of Argentia Plan Floating Dry Dock, Marine Repair Facility, MarineLink, 23 October 2026

More on this topic

How does a jack-up rig move? The rig retracts its legs, floats and is towed (wet tow) or carried on a heavy-lift vessel (dry tow), then jacks up and is accepted at the new location. A marine warranty surveyor approves the tow plan first. Port agents prepare POB transfers, waste reception, provisions and bunkers before arrival. Recent contract awards in Kuwait, Angola and Malaysia each create a short supplier window before the rig sails.

A jack-up rig move is a tow, not a voyage: the legs come up, the hull floats and tugs or a heavy-lift vessel take it to the next location. Offshore towing companies and offshore towage contractors work to a tow plan the marine warranty surveyor approves, so the approval date, not the sailing date, sets the arrival window. Port agency services then carry the load: pre-arrival notices, POB transfers, waste reception and bunkers quoted against the final persons on board. Suppliers who watch jack-up rig moves at their ports can quote before the tow begins, because most of the work is booked while the rig is still at the old location or in a yard.

A jack-up rig move is decided by the tow plan, not by the port call. A marine warranty surveyor approves the tow plan, tug bollard pull, leg-locking arrangements and weather limits, and that approval date sets the arrival window the port agent must work to. Most supplier revenue is booked in the weeks before the tow, when the rig is still at its old location or in a yard, so provisions, bunkers, waste reception and crew change support are quoted against the final POB before the rig sails.

A jack-up rig move is a marine warranty survey gate before it is a port call. The surveyor reviews the tow plan, tug bollard pull, leg-locking arrangements and weather limits, and that approval date fixes the arrival window for the port agent. Wet tow suits shorter moves within a basin; dry tow on a heavy-lift vessel suits ocean crossings. Persons on board (POB) transfers, waste reception under MARPOL, provisions, fresh water and bunkers are quoted against the final POB before the rig sails. VesselReach, built by CatalystIQ, is an AI-powered maritime sales intelligence and outreach platform for ship chandlers, bunker suppliers, port agents, repair yards and marine service companies.

Related searches: how does a jack-up rig move jack up rig move offshore towing offshore towage port agency services jack up rig specification

This article was written with AI assistance from the sources listed above. Facts are linked to their original publishers; please consult the sources before acting on them.

jack-up rigoffshore towport agencymarine warranty surveyoffshore mobilisation