Cold Ironing Requirements at Port: What Suppliers Arrange
Cold ironing at port explained for agents and suppliers: connection standards, who arranges the berth link, and how hybrid and electric vessels change the call.
Cold ironing means a vessel shuts down its auxiliary engines at berth and draws electricity from the quay instead. The supplier's job is to know which calls need it, who arranges the connection, and what else the vessel will ask for while it is plugged in.
The operational detail matters more than the sales pitch. A ship that connects to shore power at port (electricity supplied from the quay while the ship is alongside) changes the shape of the port call: a different berth requirement, a different schedule, and a different set of services around it.
What cold ironing requires at the berth
Cold ironing needs a compatible connection between ship and shore, and compatibility is not automatic. A 2015 paper in Proceedings of the IEEE describes high-voltage shore connection systems as a ship-to-shore interface with shore equipment such as transformers and converters, onboard cubicles and a shore switchboard, plus defined operating sequences (Proceedings of the IEEE).
The same paper sets out technical challenges around bonding, interactions between shore connection bonding and cathodic protection, and electrical safety where large earth fault currents occur in port facilities (Proceedings of the IEEE). In practice, that means the connection is an engineering task, not a cable handed across the rail.
- Voltage and frequency: the ship's electrical characteristics must match what the terminal supplies.
- Shore equipment: transformers, converters and switchgear sit on the quay side.
- Onboard equipment: cubicles and a shore switchboard on the vessel.
- Operating sequence: a defined order for connecting, energising and disconnecting.
Who arranges the connection
The connection itself is normally a matter between the terminal, the port authority and the vessel's technical staff. The agent's role is to make sure the information reaches the right people before the ship arrives.
That starts with the berth. Ports are testing shore power on specific berths and specific ship types rather than across the whole estate. The Port of Aarhus completed tests on Denmark's first shore power for containerships with a trial docking (The Maritime Executive, October 2026). A containership assigned to a berth without that equipment will not be connecting, whatever the charterparty says.
Agents should confirm three things before the ETA (estimated time of arrival) is finalised:
- Whether the nominated berth has shore power equipment and of what type.
- Whether the vessel is equipped and certified to connect to it.
- Who at the terminal issues the connection request and the operating sequence.
How hybrid and electric vessels change the port call
Hybrid and electric vessels make shore power part of the operating plan rather than an environmental extra. Battery capacity has to be managed across the voyage, and the berth becomes a charging stop as well as a cargo stop.
The newbuild pipeline shows the direction. ABB received Notice to Proceed from Washington State Ferries to supply and integrate the power and propulsion system for a third hybrid-electric newbuild ferry (MarineLink, October 2026). In Chile, shipbuilder ASENAV highlighted the departure of a hybrid-electric expedition cruise ship ahead of delivery (The Maritime Executive, October 2026).
For a supplier, a hybrid ferry on a short crossing behaves differently from a conventional one. Turnaround is tight, the connection window is short, and the services requested at the berth tend to be planned in advance rather than ordered on arrival.
The bulk carrier problem
Bulk carriers are the hard case, and the research says so. A 2024 paper in IEEE Electrification Magazine found that bulk carriers needing a high-voltage connection are responsible for up to 68% of greenhouse gas emissions, and argued for a high-voltage standard specific to bulk carriers (IEEE Electrification Magazine).
The same paper examined berth usage and suggested that strategically equipping the most frequented terminals with a cable management system could improve global deployment (IEEE Electrification Magazine).
For chandlers and agents serving dry bulk berths, the practical reading is that cold ironing will arrive terminal by terminal, not fleet by fleet. A yard or supplier working several bulk terminals should expect an uneven picture for years.
What the port has to build
Cold ironing is a grid problem as much as a ship problem. A 2023 paper in IEEE Electrification Magazine describes port electrification in which renewable energy resources and storage systems increase port sustainability, driven by environmental requirements in city ports (IEEE Electrification Magazine).
That work creates a procurement trail. Substations, cabling, cable management systems and connection hardware are bought, installed and maintained by someone. For marine service companies, the question is whether that someone is a contractor the port already uses or a supplier who turns up with a relevant catalogue.
Where the commercial work lands for suppliers
Cold ironing changes what a vessel needs alongside, and that is where the supplier's opportunity sits.
- Longer berth windows: a ship connected to shore power may stay longer if the schedule allows, which widens the window for husbandry (the routine services a ship needs in port, such as fresh water, stores and minor repairs).
- Technical attendance: connection faults, cable handling and switchboard issues bring service engineers to the berth.
- Compliance paperwork: emissions reporting and port requirements generate documentation the agent often coordinates.
- Hybrid-specific spares: battery and power management systems need specialist support that general chandlers do not carry.
None of this happens if the supplier hears about the call after the vessel has sailed. The commercial value of cold ironing lies in knowing which ships are coming to which equipped berths, and reaching the right person on the vessel or at the manager before the connection is made.
How VesselReach helps
Cold ironing work goes to the supplier who knows the vessel is coming and who on board or ashore owns the decision. VesselReach turns that into a workflow.
- Vessel intelligence: see vessels near your selected ports and scheduled arrivals, which means you can raise shore power, husbandry and technical support before the ETA is fixed.
- AI company targeting and decision-maker discovery: identify the manager or owner behind each vessel and the roles that matter, such as technical superintendents and port operations, which means your message reaches the person who books the service.
- Multichannel outreach with AI enquiry handling: staged email, WhatsApp and phone contact, with AI answering routine questions from approved information and escalating to your team when it cannot, which means no enquiry waits for office hours.
Book a VesselReach demo to see the workflow on your own ports, with a 10-day free trial offered after the meeting.
Key facts
- According to a 2015 paper in Proceedings of the IEEE, high-voltage shore connection systems are a ship-to-shore interface comprising shore equipment such as transformers and converters, onboard cubicles and a shore switchboard, plus defined operating sequences (Proceedings of the IEEE). Proceedings of the IEEE (Institute of Electrical and Electronics Engineers)
- According to a 2024 paper in IEEE Electrification Magazine, bulk carriers needing a high-voltage connection are responsible for up to 68% of greenhouse gas emissions, and the paper argued for a high-voltage standard specific to bulk carriers (IEEE Electrification Magazine). IEEE Electrification Magazine
- According to a 2023 paper in IEEE Electrification Magazine, port electrification in which renewable energy resources and storage systems increase port sustainability is driven by environmental requirements in city ports (IEEE Electrification Magazine). IEEE Electrification Magazine
- According to The Maritime Executive in October 2026, the Port of Aarhus completed tests on Denmark's first shore power for containerships with a trial docking (The Maritime Executive, October 2026). The Maritime Executive
- According to MarineLink in October 2026, ABB received Notice to Proceed from Washington State Ferries to supply and integrate the power and propulsion system for a third hybrid-electric newbuild ferry (MarineLink, October 2026). MarineLink
Frequently asked questions
What is cold ironing in shipping?
Cold ironing means a vessel shuts down its auxiliary engines at berth and draws electricity from the quay instead. The ship connects through a ship-to-shore interface with transformers and converters on the quay and a shore switchboard on board. Source: Proceedings of the IEEE (Institute of Electrical and Electronics Engineers)
What are the cold ironing requirements at a berth?
Cold ironing requirements are a compatible ship-to-shore connection: matching voltage and frequency, shore equipment such as transformers, converters and switchgear, onboard cubicles and a shore switchboard, and a defined operating sequence for connecting, energising and disconnecting. Source: Proceedings of the IEEE (Institute of Electrical and Electronics Engineers)
Who arranges the shore power connection when a ship berths?
The connection is normally a matter between the terminal, the port authority and the vessel's technical staff. The agent confirms the nominated berth has compatible equipment, checks the vessel is equipped and certified, and passes the connection request and operating sequence to the ship before arrival. Source: Proceedings of the IEEE (Institute of Electrical and Electronics Engineers)
Do all berths offer cold ironing?
No. Ports are testing and installing shore power berth by berth and ship type by ship type. The Port of Aarhus completed tests on Denmark's first shore power for containerships with a trial docking in October 2026, so a containership on an unequipped berth will not connect whatever the charterparty says. Source: The Maritime Executive
Why are bulk carriers harder to connect to shore power?
A 2024 paper in IEEE Electrification Magazine found that bulk carriers needing a high-voltage connection account for up to 68% of greenhouse gas emissions, and argued for a high-voltage standard specific to bulk carriers. The same paper suggested equipping the most frequented terminals with cable management systems first. Source: IEEE Electrification Magazine
How do hybrid ferries change the work at a berth?
Hybrid and electric vessels treat the berth as a charging stop as well as a cargo stop. Turnarounds are tight, the connection window is short, and services are planned in advance rather than ordered on arrival, so suppliers who know the schedule early can bundle husbandry and technical work into that window. Source: MarineLink
Sources
- Shore-to-Ship Power, Proceedings of the IEEE (Institute of Electrical and Electronics Engineers), 4 November 2015
- A Journey Into Electrical Standardization of Shore Power Connections for Bulk Carriers: Development of a bulk carrier and general cargo ship standard for shore power connections in port., IEEE Electrification Magazine, 1 December 2024
- Cold Ironing Integration in City Port Distribution Grids: Sustainable electrification of port infrastructures between technical and economic constraints, IEEE Electrification Magazine, 1 March 2023
- ABB Powers Third Hybrid Washington State Ferry Newbuild, MarineLink, 29 October 2026
- Hybrid-Electric Expedition Cruise Ship Built in Chile Set for Delivery, The Maritime Executive, 29 October 2026
- Aarhus Tests Denmark’s First Shore Power for Containerships, The Maritime Executive, 28 October 2026
Cold ironing requirements are the practical question behind shore power at port. A vessel connecting at berth needs compatible voltage and frequency, shore equipment such as transformers and converters, and a defined operating sequence agreed with the terminal. Ports are installing the equipment berth by berth, so agents should confirm the nominated berth has it before the ETA is fixed. Bulk carriers are the hard case because their electrical configurations vary widely. Hybrid and electric ferries turn the berth into a charging stop, with tight turnarounds and services planned ahead. Suppliers who know which equipped berths are receiving which vessels can offer husbandry and technical support before the connection is made.
Cold ironing requirements start with three checks before the ETA is fixed: does the nominated berth have shore power equipment, is the vessel equipped and certified to connect, and who at the terminal issues the connection request and operating sequence. The ship-to-shore interface is engineering, not a cable over the rail: transformers and converters on the quay, onboard cubicles and a shore switchboard, matching voltage and frequency, and a defined sequence for connecting and disconnecting. Ports are equipping berths one at a time, so a containership on an unequipped berth will not connect whatever the charterparty says. Bulk carriers are the hard case, and hybrid ferries turn the berth into a charging stop with tight turnarounds.
Which ships need cold ironing? Only those calling at a berth fitted with shore power equipment, and only if the vessel is equipped and certified to connect, so the answer is berth by berth rather than fleet by fleet. Who handles the connection on the day? The terminal, the port authority and the vessel's technical staff arrange it; the agent makes sure the berth details, the vessel's certification and the terminal's operating sequence reach the right people before the ETA is fixed. What does shore power mean for a supplier? A longer berth window for husbandry, technical attendance on connection faults and hybrid spares, all of which go to whoever knows the vessel is coming.
Cold ironing, also called shore power, is a berth-by-berth question rather than a fleet-wide one. The Port of Aarhus tested Denmark's first shore power for containerships, and that equipment sits on nominated berths only. A 2015 paper in Proceedings of the IEEE sets out the ship-to-shore interface: transformers and converters on the quay, onboard cubicles and a shore switchboard, and a defined operating sequence. Bulk carriers are the difficult case; IEEE Electrification Magazine reported they account for up to 68% of greenhouse gas emissions among ships needing high-voltage connections. Hybrid-electric ferries, such as the Washington State Ferries newbuild with ABB power and propulsion, treat the berth as a charging stop.