Ammonia Bunkering Guidelines: Safety and Port Permits
Ammonia bunkering guidelines explained: toxicity risk assessment, dispersion studies and port permitting, with recent commercial deliveries at Ulsan and in China.
What are ammonia bunkering guidelines?
Ammonia bunkering guidelines are the safety, operational and permitting rules that ports and suppliers follow when transferring ammonia as marine fuel. They cover toxicity, flammability, leak dispersion and emergency planning.
Ammonia is attractive because it carries hydrogen densely and burns without CO2, but its toxicity and corrosiveness make bunkering riskier than conventional fuels, according to a 2023 review in Energies. For ship chandlers, bunker suppliers and port agents, those guidelines determine who can quote, who can attend and what evidence a port will ask for.
Why ammonia safety is different from conventional bunkering
Ammonia is toxic, corrosive and flammable, so a leak can create a dangerous vapour cloud before anyone sees a flame. A 2021 study in Process Safety Progress notes that these properties pose specific safety challenges compared with conventional fuels and that risk assessment guidelines for ammonia bunkering were insufficient.
The same study proposes a Bayesian network for quantitative risk assessment of ship-to-ship ammonia bunkering, covering both toxicity and flammability. The practical point for suppliers is that a standard bunker checklist will not cover ammonia; the risk assessment must model toxic dispersion as well as fire.
What recent commercial deliveries show
Commercial ammonia bunkering is moving from demonstration to routine at a small number of ports. According to Hellenic Shipping News (November 2026), Eastern Pacific Shipping's Terra Clove was bunkered with green ammonia at Ulsan in South Korea, supplied by Envision Energy.
The Ulsan Port Authority supplied about 800 tonnes of green ammonia to Terra Clove, described as the world's first ocean-going ammonia dual-fuel very large ammonia carrier, according to Hellenic Shipping News (November 2026).
In China, Jiangsu Andefu Energy Development completed a 1,000-tonne ship-to-ship green ammonia bunker stem, Seatrade Maritime News reported (November 2026). These operations are the practical reference points for what a permitted ammonia bunker looks like.
Port permitting: what a supplier must prepare
Port permitting for ammonia bunkering usually requires a risk assessment, a dispersion study and an emergency plan before any transfer. The 2023 Energies review analysed 118 research papers and 50 regulations and guidelines, reflecting how fragmented the rule set still is.
A 2025 study in the Journal of the Korean Institute of Gas found that damage range from an ammonia leak at the loading arm varies with local environmental conditions. It proposed seasonal, region-specific safety zones and evacuation planning rather than one fixed distance for every port.
For a supplier, that means the permitting file should include:
- A quantitative risk assessment for the specific berth or ship-to-ship location.
- Seasonal dispersion modelling, not a single worst-case distance.
- Defined evacuation zones and worker escape routes.
- Evidence of crew training for toxic gas release, not only fire.
Which ports are actually ready
Confirmed commercial ammonia deliveries remain concentrated in a few locations. Ulsan and Port Hedland are the ports with confirmed commercial deliveries as of late 2026, based on the operations reported by Hellenic Shipping News and Seatrade Maritime News.
That gap matters. A Lloyd's Register study reported by Marine Insight (November 2026) warns that alternative-fuel vessel orders are outpacing port infrastructure, with methanol and ammonia bunkering still limited. For service providers, the opportunity is to be ready at the ports that permit ammonia before the fleet arrives.
Japan is building demand deliberately. Seven Japanese companies announced plans to build and operate four ammonia-fueled car carriers and commercialise the ammonia bunkering business, according to Hellenic Shipping News (October 2026).
Practical steps for chandlers, agents and suppliers
Start with the ports where you already handle port calls and check whether ammonia is permitted there. If it is not, build the relationship now so you are on the list when it is.
- Map your target ports against confirmed ammonia bunkering capability.
- Identify the decision-makers at ship managers and owners operating ammonia dual-fuel vessels.
- Prepare a permitting and safety file you can share on request.
- Track vessel arrivals and ETAs so you contact the right company before the stem is fixed.
For a broader view of which ports offer which alternative fuel, see our guide to methanol, ammonia and LNG bunkering ports. If you supply bunkers, the bunker supplier workflow shows how to turn those port calls into conversations.
How VesselReach helps
Ammonia bunkering opportunities are limited to a few ports, so finding the right ship manager before the stem is fixed matters. VesselReach detects vessels near or due at your target ports and uses AI to identify the company behind each vessel.
- Decision-maker discovery finds operations, procurement and fleet roles, which means you reach the people who approve an ammonia bunker enquiry.
- Multichannel outreach stages email, WhatsApp and phone contact, which means your team follows up without duplicating contacts.
- AI enquiry handling answers routine questions from approved information and escalates to a human when it cannot verify an answer, which means safety and permitting questions reach your specialists.
Book a VesselReach demo to see how it works on your ports.
Frequently asked questions
What are ammonia bunkering guidelines?
Ammonia bunkering guidelines are the safety, operational and permitting rules ports and suppliers follow when transferring ammonia as marine fuel. They cover toxicity, flammability, leak dispersion and emergency planning, according to a 2023 review in Energies. For ship chandlers, bunker suppliers and port agents, they set who can quote and who can attend a stem. Source: Energies (Multidisciplinary Digital Publishing Institute)
What are the main safety risks of ammonia bunkering?
Ammonia is toxic, corrosive and flammable, so a leak can create a dangerous vapour cloud before anyone sees a flame. A 2021 study in Process Safety Progress found risk assessment guidelines for ammonia bunkering were insufficient and proposed quantitative modelling of both toxic dispersion and fire, not just spill response. Source: Process Safety Progress (Wiley)
Which ports have completed commercial ammonia bunkering?
Ulsan in South Korea and Port Hedland are the ports with confirmed commercial deliveries as of late 2026, based on operations reported by Hellenic Shipping News and Seatrade Maritime News. At Ulsan, about 800 tonnes of green ammonia went to Terra Clove; in China, Jiangsu Andefu Energy Development completed a 1,000-tonne ship-to-ship stem. Source: Hellenic Shipping News
What does a port permit require for ammonia bunkering?
Port permitting for ammonia bunkering usually requires a quantitative risk assessment for the specific berth or ship-to-ship location, seasonal dispersion modelling, defined evacuation zones and worker escape routes, and evidence of crew training for toxic gas release. A 2025 study in the Journal of the Korean Institute of Gas found damage range varies with local conditions, so safety zones should be region-specific. Source: Journal of the Korean Institute of Gas
Is ammonia bunkering growing?
Yes. Commercial deliveries at Ulsan and in China in late 2026 moved ammonia bunkering from demonstration toward routine at a few ports, and seven Japanese companies announced plans to build and operate four ammonia-fueled car carriers and commercialise the ammonia bunkering business, according to Hellenic Shipping News (October 2026). Source: Hellenic Shipping News
How can ship chandlers and bunker suppliers find ammonia bunkering opportunities?
Ship chandlers and bunker suppliers can track vessels near or due at ports where ammonia is permitted and identify the ship manager behind each vessel before the bunker stem is fixed. VesselReach detects arrivals and finds decision-makers by role, so outreach reaches the right company earlier.
Sources
- Safety Assessment of the Ammonia Bunkering Process in the Maritime Sector: A Review, Energies (Multidisciplinary Digital Publishing Institute), 10 May 2023
- Seasonal Risk Assessment by Region for Ensuring Evacuation Safety During Ammonia Ship Bunkering in Ports, Journal of the Korean Institute of Gas, 30 June 2025
- Quantitative risk assessment for ammonia ship‐to‐ship bunkering based on Bayesian network, Process Safety Progress (Wiley), 30 November 2021
- The Week in Alt Fuels: Ammonia and methanol bunkering gain ground, Hellenic Shipping News, 6 November 2026
- Ulsan Port Advances Commercial Green Ammonia Bunkering Capabilities with 800-Tonne Fuel Supply to World’s First Ammonia Dual-Fuel VLAC, Hellenic Shipping News, 5 November 2026
- Successful ship-to-ship bunkering of green ammonia in China, Seatrade Maritime News, 10 November 2026
- Seven Japanese Companies Jointly Announce to Build and Operate Four Ammonia-Fueled Car Carriers and Commercialize the Ammonia Bunkering Business, Hellenic Shipping News, 27 October 2026
Ammonia bunkering guidelines cover the safety, toxicity and permitting rules for transferring ammonia as marine fuel. Ammonia is toxic, corrosive and flammable, so ports require risk assessments and dispersion studies before any transfer. Commercial deliveries have taken place at Ulsan and in China, but most ports are not yet ready. For ship chandlers, bunker suppliers and port agents, the practical step is to track vessels at ports where ammonia is permitted and reach the ship manager before the bunker stem is fixed.
What is bunkering procedure for ammonia? It starts with a quantitative risk assessment, a dispersion study and an emergency plan approved for that berth or ship-to-ship location. How does bunkering work at a port that is not yet ready? It does not: confirmed commercial ammonia deliveries remain concentrated at Ulsan and Port Hedland, so suppliers should build relationships at target ports before permits arrive. Which alternative fuels corridor matters for ammonia? Japan is building demand deliberately, with seven companies planning four ammonia-fueled car carriers and a commercial bunkering business.
The most useful point for a supplier is that ammonia permitting is site-specific. A 2025 study in the Journal of the Korean Institute of Gas found that leak damage range at the loading arm varies with local environmental conditions, so it proposed seasonal, region-specific safety zones and evacuation planning rather than one fixed distance for every port. That means a permitting file built for one berth does not transfer to another, and a supplier should prepare a quantitative risk assessment, seasonal dispersion modelling and defined evacuation zones for each location before quoting.